Guides / Where to start

Software built for how you actually run.

Something in your operation isn't getting handled by the systems you already pay for. Less of it needs building than you'd think, and the difference is real money.

Your ERP won't do the thing. The vendor quoted a number with a comma in it, or said the feature is on a roadmap. Somebody is doing the work by hand in the meantime and it's eating a day a week. So you start looking for someone to build something.

Before you pay anybody, check which of three things you're actually looking at. Only one of them is really a build.

Three levels, and most operations need the first two

I'll tell you which level you need, including when the answer is that you don't need me to build anything. That's what makes it mean something when I do say something's worth building. And if the reason you're here is that you can't fill a role and the work still has to get done, start with you can't hire your way out of this one.

What genuinely does need building

The work that's actually paid for itself in the operations I've worked with looks like this:

What doesn't need building, most of the time: another dashboard, a replacement for a system that basically works, or a general purpose platform to solve a specific irritation.

What to ask whoever you hire, including me

Ask these no matter who you hire. They separate the people who finish from the people who leave you with something half-built and a login that doesn't work:

How I work, plainly

I spent my career in manufacturing, including a decade running a machine shop, and I now build and run software for manufacturers. The order matters. Most people offering this understand software or they understand your operation, rarely both, and the gap between the two is where these projects fail.

It starts with a paid Diagnostic, which is a short scoped piece of work where I look at how the thing actually runs today and decide what's worth doing, including whether anything is. You get a written scope with pricing for whatever earns its place. Then a Build quoted up front, so you know the number before it starts. No hourly billing.

I host it and keep it running on managed infrastructure, working on top of the systems you already run, so nothing moves to a new platform. There's an ongoing care plan after that covering hosting, monitoring, fixes and small adjustments as your operation changes, with term and price by agreement. That ongoing cost is real and I would rather name it here than surprise you with it later.

From the work
Built, deployed, and running in a real operation

The things described on this page aren't proposals. A vendor PO confirmation watcher that reads acknowledgements and flags only what doesn't match. Order intake that reads a customer PO and checks it against the quote before anybody keys it. A quoting engine that does the reading and typing and checks every line is costed. A morning brief that assembles cash, backlog and sales overnight. All in daily use at a mid-size manufacturer, on the systems it already ran.

See selected work →

Common questions

Do you replace our ERP?

No, and I would push back hard on anyone suggesting it as a first move. Your ERP stays the system of record. What I build reads from it, and writes back only where you specifically want that.

How big does a company need to be for this?

Smaller than most people assume. The AI setup level has no real floor. For a build, the question isn't headcount, it's whether there's a specific recurring cost you can point at. One person spending a day a week on something is a real number, and it's already being paid, just not on an invoice.

Can we start small?

You should. One annoying problem, scoped and priced on its own, is the right way in. It tells you whether working together is any good long before either of us is committed to anything large.

What if we already have someone in-house?

Then you may not need me, and I'll say so. Where it usually still makes sense is when the in-house person is covering IT and infrastructure rather than writing software against your ERP, which are genuinely different jobs.

Where this usually starts. Most of the work that gets commissioned begins as one of these: vendor PO acknowledgements slipping through, customer orders keyed in by hand, numbers you can't get on one page, or reports the ERP won't give you. If you aren't sure you need an ERP at all yet, start with running on QuickBooks and spreadsheets.

Contact

Not sure how much of this actually needs building?

That's the most useful conversation to have, and it's free. About 30 minutes on how the work runs today and where it's costing you. If the answer is that you need less than you thought, I'll say so, and if it's that you need nothing built at all, I'll say that too.

Email Jason See selected work →